Located in Kampong Thom Bay, northeast of Sihanoukville, Cambodia, with an installed capacity of 2×350,000 kW, Xigang Project adopts Chinese standards, Chinese technology and Chinese equipment, and is the coal-fired power project with the largest installed capacity, the most advanced indexes and the highest environmental protection level in Cambodia. The project was started on August 18, 2020, and took 27 months to put into full operation. The full commissioning of the project is of great significance for improving the power supply structure and power infrastructure in Cambodia, and will play an important role in enhancing the friendship between the Chinese and Cambodian people, deepening the economic and technical cooperation between the two countries, and promoting the rapid development of the local economy and society.
During the construction process, the project team, with the goal of “beautiful environment, high-quality engineering, and efficient operation”, overcame the high temperature and rain, and pushed forward the project's high-quality performance, realizing the comprehensive “going out” of China's design, standards, equipment, technology, management and services with clean and high-efficiency high-quality projects. ”
