One stop solution for magnetic products
The Karachi Nuclear Power Project (K2, K3) is the largest nuclear power project in Pakistan. In 2021, the first overseas unit of the "Hualong-1" - Karachi Nuclear Power Plant Unit 2 (K-2) (1,100 MW or 1.1 million kW) was officially put into commercial operation, with an estimated annual power generation of about 9 billion kilowatt-hours.
Saint Langma customized iron removal and filtration equipment for it. The equipment will contain high-performance NdFeB products produced by our factory. We install NdFeB products in the equipment to achieve the purpose of removing impurities. The equipment can quickly capture iron-based and non-iron-based impurities in the high-speed water flow of the unit's condenser in non-energy-consuming operation mode.
Our high-performance permanent magnet product effectively prevents impurities from flowing downstream, avoiding erosion and deposition corrosion of impurities on subsequent pipelines and equipment, extending service life, and reducing safety hazards.
Search
Categories List
Please give us a message
Beijing Saint Langma Magnetic Technology Co.,Ltd